Horkheim weir System (Horkheim, Neckar)
Horkheim weir system is located at Heilbronn-Horkheim. The weir system's location is at waterway kilometre point 120.45A. It has three weir fields. The existing roller gates and the solid construction had deteriorated with age and were in need of complete refurbishment. The overall project was divided into several stages.
Scope of planning:
- New roller gates including carriages and mounted fish-belly flap
- Sill/lateral reinforcements
- Rail systems
- Chain drives including a replacement device
- Submerged inspection gates
- Pier accesses including access to roller gates
- Inspection carriage
Planning was performed in cooperation with our engineering partners DriveCon GmbH and Weber Ingenieure.
Structural planning
Project planning
Technical equipment
Manufacture supervision
Other projetcs
-
Weir Stuhlmüller
Berghausen
-
Weir Petershagen
Petershagen
-
Weir Drakenburg
Drakenburg
-
Fischpass Doesburg
Doesburg, Netherlands
-
Schluchseewerke
Bad Säckingen
-
5 Weirs on the River Main
Erlabrunn, Harrbach, Steinbach, Rothenfels, Freudenberg
-
Old Lock
Kiel-Holtenau
-
Flood retention reservoir
Beimbach
-
Pumped storage scheme
Waldeck, Edersee
-
rack cleaning machine
Megolo, Italy
-
Limbach Weir
Limbach, Main
-
Xayaburi dam
Mekong, Laos
-
Standard mitre gates
Neckar
-
Roller gate survey
Viereth, Main
-
Neckarsulm Weir
Neckarsulm, Neckar
-
Besigheim Lock
Besigheim, Neckar