Repair of Limbach weir (Limbach, Main)
Due to a ship collision on the weir of Limbach Mitte, the load-bearing effect of the damaged gate (30 m wide triple-braced gate with flap) had to be assessed, and the repair of the damaged horizontal and vertical stiffeners of the skinplate had to be planned as well as structurally calculated.
The two bypass gates on the left and right (30 m wide roller gates) were recalculated, and a stability analysis was performed in accordance with the applicable codes and standards.
Completion of the work was supervised on site.
Survey
Project planning
Structural planning
Refurbishment
Manufacture supervision
Other projetcs
-
Weir Stuhlmüller
Berghausen
-
Weir Petershagen
Petershagen
-
Weir Drakenburg
Drakenburg
-
Fischpass Doesburg
Doesburg, Netherlands
-
Schluchseewerke
Bad Säckingen
-
5 Weirs on the River Main
Erlabrunn, Harrbach, Steinbach, Rothenfels, Freudenberg
-
Old Lock
Kiel-Holtenau
-
Flood retention reservoir
Beimbach
-
Pumped storage scheme
Waldeck, Edersee
-
rack cleaning machine
Megolo, Italy
-
Xayaburi dam
Mekong, Laos
-
Standard mitre gates
Neckar
-
Roller gate survey
Viereth, Main
-
Neckarsulm Weir
Neckarsulm, Neckar
-
Besigheim Lock
Besigheim, Neckar